1. Inchung pakhat hnuaia siam chhuah zawng zawng, sub-factory .
|
|
● Sunwee hian hmanraw kimchang tak tak a nei a, chung zingah chuan metal processing, powder coating, plastic injection, sewing, assembling leh packaging te a tel. Producing procedure zawng zawng hi quality control khauh tak hnuaiah a awm vek a ni. |
2. Lab test 1000 a ni.
|
|
● 100% "in-Store Inspection" tih hian kan laboratory-a kan warehouse-a thil dahkhawm a nih chuan QC department-in, chu chu F/R, water repellent, tally checking, colour fastness, tensile strength, tear strength, etc, MTL ang bawka facility te a ni. |
3. Line process chungchanga enfiah .
|
|
● QC inspector tawnhriat ngah tak takte chu ON{2}}line process-ah dah an ni a, line-a defect an hmuh chuan "stop call" an ti a ni. chu hmang chuan, kan thil siam chhuah, a pum puia inzawm khawmte chhiatna chu kan ti tlem thei a ni. |
4. 100% Set-Up inspection .
|
|
● Kan thil siam apiang (cabin a nih chuan hanging system kan hmang) a, 100% set- Up Inspection kan tih chuan defect nei products completed kan release ngai lo. |
5. Loading & Rigidity Test .
|
|
● Loading & rigidity test kit kan nei a, model siam thar apiang leh product tin random taka load & rigidity test tak tak kan ti bawk. |
6. ISO 9001:2000 ah a awm a.
|
|
● Kum 2000-a ISO {9001 1994 version hmuh, leh kum 2000-a 2000 version, kan quality control system ṭha taka tihfel theihna min pe a, zero defects challenging. |






